Reseller Login Contact
Search  
 
ZetronWeb
  • HOME
  • CORPORATE
    • About Zetron
    • Contact
    • Careers
    • Our Executives
    • Open Standards
    • Partners
    • Committed to Quality
    • History
    • Ethics Compliance
  • MARKETS
    • Public Safety
    • Federal Government
    • Transportation
    • Utilities & Resources
    • Healthcare
    • Hospitality
    • Campuses & Facilities
  • PRODUCTS
    • Radio Dispatch
      • Acom
      • MAX Dispatch
      • Series 4000
      • Integrator RD
      • M4010 Console
      • DCS-5020
      • Speakers/Microphone
      • Console Furniture
      • iRIM
      • RoIP Gateway
      • M232 Data/Voice Multiplexer
      • M250 Tone Remote Adapter
      • M251 DC Remote Control
    • E9-1-1 Call Taking
      • MAX Call-Taking
      • Series 3300 & 3200
    • Fire Station Alerting
      • IP FSA
      • M25 Instant-Call Encoder
      • M26 Fire Station Dispatcher
    • Paging
      • M16 TAP Paging Encoder
      • M32 Dial Access Paging
      • M61 TNPP Paging Encoder
      • M64 Paging Terminal
      • M640 Paging Terminal
      • Series 2000 Paging Terminals
      • M33 PURC Network Controller
      • M55B Page Buffer
      • M55D POCSAG Repeater
      • M66 PURC Transmitter
      • M68 Transmitter Controller
      • M600/620 Manager/Encoder
      • M5 Desktop Encoder
      • M15 Multi-Format Encoder
      • M25 Instant-Call Encoder
    • Trunked Radio
      • M427 MAP27 Interface
      • M807 Single Site Controller
      • M827 Multi Site Controller
      • M844 4-Port Intersite Link
      • M452 Repeater Controller
      • M459 Interconnect Repeater
    • Remote Monitoring
      • M1512 Automatic Dialer
      • M1516 Alarm Reporter
      • M1517 Alarm Reporter
      • M1550 Autodialer
      • M18/18+ Control Link
      • M1700 Controller
      • M1730 Controller
      • M1708/1716 RTU
      • M1732 RTU
    • Repeater Controllers
      • M37 Repeater Control
      • M37-MAX Repeater Panel
      • M38A Repeater Tone Panel
      • M38-MAX Repeater Panel
      • M48jr One-line Interconnect
      • M48-MAX Interconnect
    • Desktop Remotes
      • HEAR Decoder (Hospital)
      • M284 Four Line Remote
      • M360 Kenwood Remote
      • M390 TETRA Remote
    • Interconnects
      • DeadBolt Surge Arrestor
      • M30 Worldpatch
      • M35A Microconnect
      • M45B Z-Patch
      • M735 Radio Teleconnect
    • All Products
  • SERVICES
    • On-Site Services
    • Project Management
    • Technical Support
    • Training
      • Class Schedule
      • Course Descriptions
      • Location & Lodging
      • Factory Training
      • On-site Training
      • International Training
  • NEWS
    • Advantage
    • Case Studies
    • Press Releases
    • Trade Shows

Services
On-Site Services
Project Management
Technical Support
Training
Project Management
Organizational Structure
Custom Solutions are assigned to Zetron's Project Office which reports directly to the President of Zetron. The mission of this office is to ensure that every project is implemented, managed, and completed to the customers' total satisfaction. Our project management system includes processes that encompass all steps from task definition and resource management through system design, development, manufacturing, testing, certification, installation and configuration, site acceptance, customer support, on-going maintenance, and future enhancements.

Project Management Duties
Starting with a detailed requirements document and field surveys, combined with user and task analyses, Zetron's Project Office oversees all phases of our systems projects. Zetron tracks all project elements with formal processes that establish and track milestones, schedules for deliverables, and resource utilization. Personnel, equipment, materials, subcontractor scheduling, installation, costs, and a host of other parameters are closely tracked to ensure the success of the project.

Zetron's high level of technical expertise in system connectivity spans projects that have very different functional and application requirements. The successful completion of large system projects for customers around the world demonstrates our ability to manage large integration efforts.

  • Requirements definition
  • Task definition
  • Staffing and resource allocation
  • Material selection and equipment specification
  • Manufacturing
  • Site preparation and compliance with any regulatory or environmental requirements
  • Factory acceptance testing
  • Equipment staging and shipment
  • Systems integration
  • Equipment installation and integration
  • On-site aceptance testing
  • Commissioning
  • Operator and maintenance training and documentation
  • Maintenance practices
  • Remote and onsite diagnostics and troubleshooting
Support Services
Zetron's efforts on behalf of our customers do not end when the project is completed and approved. We provide a complete suite of post-project support once the system has moved into its operational phase.

Individual support contracts can be established with each customer according to the system and the customer's requirements. Support services include the following:

  • Training - system operation, installation, and maintenance, train-the-trainer
  • Replacement of equipment
  • Upgrades on repaired equipment
  • Extended warranty coverage
  • Comprehensive service support
  • Help Desk
 

Zetron Americas
PO Box 97004
Redmond, WA
98073-9704, USA
(p) +1 425 820 6363
(f) +1 425 820 7031
(e) zetron@zetron.com

 

Zetron EMEA
27-29 Campbell Court
Bramley, Hampshire
RG26 5EG, United Kingdom
(p) +44 1256 880663
(f) +44 1256 880491
(e) uk@zetron.com

 

Zetron Australasia
PO Box 3045
Stafford Mail Centre,
Stafford QLD 4053, Australia
(p) +61 7 3856 4888
(f) +61 7 3356 6877
(e) au@zetron.com

 

Contact Zetron

Reseller Login

Follow Zetron on Twitter!


Home

Corporate

Markets

Products

Services

News

 

Login

 

©  Zetron, Inc.

Website questions or comments?